Glass and ceramic plants run furnaces and kilns around the clock, so a panel failure can freeze a melt or crack a kiln load. Kulaina builds PCC, MCC and APFC panels for these plants with heat-rated components, dust-sealed enclosures and redundant feeders for furnace-critical loads, then supports them under AMC.
Risks we design for
Furnace and kiln loads cannot stop
An unplanned trip on a furnace blower or kiln drive can freeze a melt or crack a full load. Critical feeders need selective protection and draw-out breakers that can be serviced without a shutdown.
Heat and fine dust in the electrical room
Silica and glaze dust settle on busbars and terminals and raise operating temperatures. Enclosures need the right IP rating, filtered ventilation and derated components.
Large, fluctuating motor loads
Blowers, mills and conveyors start and stop through the day, which pulls power factor down and invites penalties. An APFC panel with enough stages keeps it close to unity.
Recommended panels
Most glass and ceramic plants can’t afford a planned shutdown more than once or twice a year. That window decides when panel work happens, so we agree the changeover sequence with your maintenance team at the drawing stage, not on site.
From one of our projects
Compliance notes
- Panels built to IS 8623 and IEC 61439
- Enclosure IP rating chosen for the dust and heat at the installation point
- Selective protection, so a fault on one line does not trip the furnace feeders
Frequently asked questions
Can a panel be replaced without stopping the furnace?
Usually, yes. The changeover is planned around your shutdown window, furnace-critical feeders are moved first and a temporary supply is kept ready, so the melt is not put at risk.
Which panels does a typical glass plant need?
A PCC fed from the transformer and DG set, MCCs for furnace blowers, batch house and conveyors, and an APFC panel to hold power factor near unity as motor loads change.
Discuss your panel requirement
Send your single-line diagram, BOQ or tender reference. An engineer replies within one working day.